Quick answer
How do I keep later containers the same as the first?
Later containers of hookah coals match the first when the specification is fixed in numbers and signed before each production run. Each arrival is then measured the same way. A grade name alone does not fix it, because a name carries no number. Three papers hold a reorder to the first container: the spec-lock sheet, your reference sample and the arrival sheet.
1. Why batches drift between orders
Hookah coals are pressed from a natural material in separate production runs, so two runs are never the same run. Four things can move between them.
Definition
batch consistency
Batch consistency is the degree to which production runs made to one specification give the same measured values.
- The raw material lot. Shell charcoal arrives in lots, and lots differ in ash and moisture.
- The mix. The ratio of powder, binder and water sets how a piece holds together.
- Drying. Time in the ovens and the weather on the day change the moisture a piece ends with.
- Packing. A different inner unit or carton changes how pieces travel.
Note
None of these is a fault in itself. Each is a reason to state the result you need as a number, so that it can be checked.
2. What to fix in writing
The commonest cause of a different second container is the order itself: "the same as last time". That sentence fixes nothing, because nobody wrote down what last time was.
Fix three things in writing before each run.
- The numbers: size with its tolerance, pieces per kilogram, the ash range, moisture, each with its method. They are rows of the specification sheet.
- The reference sample: pieces from a batch you approved, which later production is compared with.
- The packing: the inner unit, the master carton and the marks.
Definition
reference sample
A reference sample is a set of pieces from an approved batch that the buyer and the factory keep in order to compare later production against it.
At this factory ash alone sets the grade; moisture, volatile matter and fixed carbon are reported on the lab report. So the ash range is the number to write first; the grade name stays a label beside it. The ranges of the three grades are on the page of the grades in numbers.
3. Three papers that hold a reorder to the first container
Each control needs a paper that holds it. There are three, and the buyer holds two of them.
| Paper | What it fixes | Who holds it | Where |
|---|---|---|---|
| The spec-lock sheet | The numbers, the packing and the marks of one production run | Both sides sign it | The spec-lock sheet |
| Your reference sample | What an approved piece looks, weighs and burns like | You keep it, sealed and dated | The specification sheet |
| The arrival sheet | What each container measured on the day it was opened | You fill it in | The arrival sheet |
The factory keeps its own standard as well: a sample of about 25 kg from every batch for 5 years. When a buyer reports a difference, the retained sample of the batch is compared with what the buyer reports.
Tip
On a reorder, send the signed sheet again with a new date. Do not send a message that says "repeat".
4. When a container differs
When a container does not match, work in this order.
- Measure. Compare the arrival with your reference sample and with the signed numbers, the same way you measured before.
- Send the arrival sheet with your figures and the carton marks. It goes to the quality control desk, run by Sri Wahyuni, Quality Control Supervisor.
- If the difference is outside what was signed, follow the route on the page about complaints and claims.
Important
A difference you can show in numbers can be answered. "It feels different" cannot be checked by anyone.
Then correct the paper, not only the batch. If the difference came from something the sheet did not state, add that line to the sheet before the next run, so the same gap cannot open twice.