Quick answer
How do I fix what will be made before production starts?
A spec-lock sheet fixes the shape, the grade numbers, the packing and the marks for one production run of hookah coals. Both sides sign it before production starts, and a reorder reuses it with a new date. The specification sheet helps you choose the numbers; this sheet ties them to one order, so that what was agreed can be read later.
The spec-lock sheet at a glance
As declared, November 2026
- Fixes
- Shape and size, grade numbers, inner and master packing, marks, reference sample
- Signed by
- Buyer and factory, before production starts
- A change
- A new dated sheet
- A reorder
- The same sheet with a new date
- Sent to
- The export sales desk
1. What the sheet fixes
The sheet fixes five things for one production run. Each line has a place for your requirement and is read against the factory's stated figure.
Definition
spec-lock sheet
A spec-lock sheet is a dated form on which the buyer and the factory sign the specification, the packing and the marks for one production run.
| Line | What you write | Read against |
|---|---|---|
| Shape and size | The shape, the size and the tolerance you accept | The factory states a tolerance of ±0.3 mm per side |
| Grade numbers | The ash range, with moisture, burn time and breakage, each with its method | Target ash ranges: Platinum 1.6-1.9%, Super Premium 1.9-2.2% and Premium 2.3-2.5% |
| Inner and master packing | The inner unit and the master carton | 1 kg box or 1 kg plastic bag without box; inside a 10 kg carton or 20 kg carton |
| Marks | What is printed on the side of the carton | Set by your order |
| Reference sample | Which approved pieces the run is compared with, and who holds them | Kept by you, sealed and dated |
Note
The sheet records what both sides agreed. It is not a promise of a result; the lab report and your arrival check show what was made.
2. Specification sheet or spec-lock sheet
Two sheets, two jobs. The specification sheet is where you choose: it lists every parameter with the factory's targets, and you write your own requirement beside each.
The spec-lock sheet is where you stop choosing. It carries only the numbers you settled on, for one order, with a date and two signatures. A first order needs both, in that order; the steps around them are on the page about the minimum order and a first order.
Tip
Sign the spec-lock sheet after the sample is approved and before the first payment. That is the moment the numbers stop moving.
3. Changes after signing
A change after signing is a new sheet. Write the changed line, date the sheet, and have both sides sign again.
A change agreed in a chat or on a call and never written down is the commonest reason two sides remember an order differently. Printed packing has its own handoff, the artwork sheet, and a changed design is a new version of that sheet as well.
Important
If production has started, ask what the change does to the date before you sign it.
4. The sheet on a reorder
A reorder reuses the sheet. Send it again with a new date, and both sides sign for the new run. Nothing is carried over by habit.
That is what keeps a later container like the first, as the page about consistency between orders explains. On arrival, the figures on the sheet are what you measure against on the arrival sheet. If you are moving a running brand from another supplier, the same sheet is the starting point: see the page about switching supplier.
5. Spec-lock sheet
Fill in the lines and send the sheet; it goes to the export sales desk, to Aditya Ramadhan, Export Sales Manager. The reply is the same sheet, checked line by line, for both sides to sign.