Quick answer
What will a container cost, and how do I compare offers?
The price of a container depends on six inputs: grade, shape and size, inner packing, printing, container size and delivery term. This factory quotes per order; a dated price list appears here only when the factory issues one. To compare two quotes, bring both to one unit at the same delivery term and the same load.
How the factory quotes
As declared, November 2026
- Sold by
- The full container, 1 container minimum
- Container sizes
- 20 ft and 40 ft
- Grades
- Platinum, Super Premium and Premium (target)
- Inner unit
- 1 kg box or 1 kg plastic bag without box (target)
- List price on this page
- None; the factory quotes per order
1. Six inputs that set the price
Six inputs set the price of a container. Each one is a field of the quote sheet.
Definition
quote
A quote is a supplier's dated price offer for a stated product, packing, quantity and delivery term.
| Input | Which way it moves the price | What to state in the request |
|---|---|---|
| Grade | A tighter ash range is priced higher | The ash range you need, not only the grade name |
| Shape and size | A shape or size outside the standard cubes is priced separately | The shape and the size in millimeters |
| Inner packing | A printed box costs more than a plastic bag | The inner unit and the master carton |
| Printing | Your own brand adds a cost per design and has a minimum | Own brand or neutral cartons, and the number of designs |
| Container size | The price per ton differs between sizes, because the load differs | The container size and how many |
| Delivery term | A term that includes freight is higher than a price at the port of loading | The term you want and the destination port |
The first input is explained on the page of the grades in numbers, the third on the page about packing formats, and the fifth on the page about container loads.
2. What an itemized quote must show
A quote you can act on states seven things. If one is missing, ask for it before you compare.
- the unit price and the unit it applies to;
- the packing: inner unit and master carton;
- printing, if the boxes carry your brand;
- the delivery term and the port;
- the load per container;
- the date until which the quote is valid;
- the payment stages.
Important
A quote without a validity date is not a quote. Raw material and freight move, and a price holds only until the date it states.
3. How to compare two quotes
Two quotes can be compared only after they are made alike. Four steps do it.
-
Step 1
Put both quotes on the same term
Same point of delivery. A price at the factory gate and a price delivered to your port are not the same thing. Ask both suppliers for the same delivery term.
-
Step 2
Put both quotes on the same load
Same tons per container. A lower price per ton on a smaller load can cost more per container. Read the load in each quote.
-
Step 3
Put both quotes on the same specification
Same numbers. Compare the ash range, the size and the packing line by line. Two quotes for the same grade name can describe different goods.
-
Step 4
Bring both to one unit
Then compare. Convert both to a price per kilogram or per carton, and only then set them side by side.
Caution
A low price per ton can hide a smaller load or a different term. Compare what arrives at your warehouse, not the first number on the page.
4. Per ton, per kilogram, per carton
Suppliers quote in three units. The arithmetic between them is fixed, so any quote can be restated.
- Per ton to per kilogram: divide by 1,000.
- Per kilogram to per carton: multiply by the net weight of the master carton.
- Per carton to per container: multiply by the carton count in the load.
For a retail brand a fourth unit matters: the price per piece. Divide the price per kilogram by the pieces per kilogram of your size.
Note
This page gives the arithmetic only. It states no price, no range and no discount, for this factory or for any other.
5. Get a dated quote
To get a figure, send the six inputs. The reply is an itemized quote with a validity date, and it is the only place where this factory states a price.
The inputs are the fields of the quote sheet. What each payment stage is, and what a correct proforma invoice shows, is on the page about payment terms.
Tip
If the factory issues a dated price list, it will be published on this page with its date. Until then, every price is a quote.