Export sales desk
Desk leadAditya RamadhanExport Sales Manager
What to send
- The quote sheet with its twelve order fields
- Your target loading date, if you have one
What comes back
- An itemized quote for a full container
The sheet for this desk Quote sheet
Quick answer
What happens between my first message and the container leaving?
An order runs in seven steps: quote, sample, specification, proforma invoice and first payment, production and weathering, loading and documents, balance and release. Each step has a sheet or a paper and a named desk. The order of the steps protects the buyer: the specification is fixed before the first payment, and every order sheet is the form the desk works from.
In this section
-
Hookah Coal Prices — What a Factory Quote Is Built From
The price of a container depends on six inputs: grade, shape and size, inner packing, printing, container size and delivery term.
-
Minimum Order: One Container — Making a First Order Safe
The minimum order is one full container, 20 ft or 40 ft.
-
Payment Terms — How, When and to Whom You Pay the Factory
Payments are made by bank transfer against a proforma invoice issued by PT Hookah Coals Coconut Charcoal Indonesia.
1. The seven steps
An order moves through seven steps in a fixed order. The table gives what happens at each, the sheet or the page for it, and the desk that handles it.
| Step | What happens | Sheet or page | Desk |
|---|---|---|---|
| 1. Quote | You send the order details; the desk replies with an itemized quote | Quote sheet | Export sales: Aditya Ramadhan |
| 2. Sample | You receive samples and score them in one session | Sample request sheet | Export sales: Aditya Ramadhan |
| 3. Specification | Both sides agree and sign the numbers of the order | Specification sheet | Quality control: Sri Wahyuni |
| 4. Proforma invoice and first payment | The invoice repeats the quote and the specification; you pay the first stage | Payment terms | Accounts: Ratna Lestari |
| 5. Production and weathering | The coals are pressed, dried and rested before packing | Capacity and lead time | Production: Doni Setiawan |
| 6. Loading and documents | The container is loaded and the papers are issued | Export documents | Shipping and documents: Dwi Saputro |
| 7. Balance and release | You pay the balance as the proforma invoice states | Proforma invoice | Accounts: Ratna Lestari |
Important
Do not pay before step 3 is finished. A payment made on an open specification leaves nothing to hold the goods against.
2. What the export desk needs first
Everything starts with the quote sheet. Its twelve fields are the inputs of the price: shape, grade, packing, port and volume among them.
Why the factory publishes no list price, and how to compare two quotes, is on the page about what a factory quote is built from. If the boxes carry your brand, read the page about private label steps and minimums before you ask, because printing changes both the price and the time.
Tip
Each order sheet is listed, in the order you will need it, on the page of all order sheets.
3. How long an order takes
The time an order takes is the sum of its steps, and one of them has a fixed minimum: the coals rest after production before they may be packed.
What sets the lead time, and what a buyer can do to keep an order on time, is on the page about capacity and lead time. The lead time for your order is stated in your quote.
Note
This page gives no number of days. The factory has not published one, and a number that is not stated is not estimated.
4. Your first order
The minimum order is 1 ocean container. A first order is made safe by finishing the checks in order, not by ordering less.
The checks, from verifying the company to the papers named in the purchase order, are laid out on the page about the minimum order and a first order.
A second order repeats steps 3 to 7. The specification is already signed, so a repeat order starts from a new quote and a new proforma invoice that name the same sheet.
Note
The payment stages, and what a correct proforma invoice from this company shows, are on the payment terms page linked in step 4 of the table.