Skip to content

PT Hookah Coals Coconut Charcoal Indonesia · Mungkid, Magelang, Central Java, Indonesia

Menu

Desk

How to Order Hookah Coals from the Factory — Steps and Sheets

This page shows how an order runs at the hookah coals factory in Magelang, for importers of shisha charcoal by the container. Seven steps, each with a sheet or a paper and a named desk.

Written by
Rudi Kurniawan
Updated
A quote for a container starts from a filled-in quote sheet, not from a one-line message.

Export sales desk

Desk leadAditya RamadhanExport Sales Manager

What to send

  • The quote sheet with its twelve order fields
  • Your target loading date, if you have one

What comes back

  • An itemized quote for a full container

The sheet for this desk Quote sheet

Quick answer

What happens between my first message and the container leaving?

An order runs in seven steps: quote, sample, specification, proforma invoice and first payment, production and weathering, loading and documents, balance and release. Each step has a sheet or a paper and a named desk. The order of the steps protects the buyer: the specification is fixed before the first payment, and every order sheet is the form the desk works from.

1. The seven steps

An order moves through seven steps in a fixed order. The table gives what happens at each, the sheet or the page for it, and the desk that handles it.

The seven steps of an order for hookah coals, with what happens at each step, the sheet or page for it, and the desk and desk lead who handle it. Desk leads as declared by the factory.
StepWhat happensSheet or pageDesk
1. Quote You send the order details; the desk replies with an itemized quote Quote sheet Export sales: Aditya Ramadhan
2. Sample You receive samples and score them in one session Sample request sheet Export sales: Aditya Ramadhan
3. Specification Both sides agree and sign the numbers of the order Specification sheet Quality control: Sri Wahyuni
4. Proforma invoice and first payment The invoice repeats the quote and the specification; you pay the first stage Payment terms Accounts: Ratna Lestari
5. Production and weathering The coals are pressed, dried and rested before packing Capacity and lead time Production: Doni Setiawan
6. Loading and documents The container is loaded and the papers are issued Export documents Shipping and documents: Dwi Saputro
7. Balance and release You pay the balance as the proforma invoice statesProforma invoiceAccounts: Ratna Lestari
Each step of an order has its own sheet, and a printed sheet can be filled in by hand.

Important

Do not pay before step 3 is finished. A payment made on an open specification leaves nothing to hold the goods against.

2. What the export desk needs first

Everything starts with the quote sheet. Its twelve fields are the inputs of the price: shape, grade, packing, port and volume among them.

Why the factory publishes no list price, and how to compare two quotes, is on the page about what a factory quote is built from. If the boxes carry your brand, read the page about private label steps and minimums before you ask, because printing changes both the price and the time.

Tip

Each order sheet is listed, in the order you will need it, on the page of all order sheets.

3. How long an order takes

The time an order takes is the sum of its steps, and one of them has a fixed minimum: the coals rest after production before they may be packed.

What sets the lead time, and what a buyer can do to keep an order on time, is on the page about capacity and lead time. The lead time for your order is stated in your quote.

Note

This page gives no number of days. The factory has not published one, and a number that is not stated is not estimated.

4. Your first order

The minimum order is 1 ocean container. A first order is made safe by finishing the checks in order, not by ordering less.

The checks, from verifying the company to the papers named in the purchase order, are laid out on the page about the minimum order and a first order.

A second order repeats steps 3 to 7. The specification is already signed, so a repeat order starts from a new quote and a new proforma invoice that name the same sheet.

Note

The payment stages, and what a correct proforma invoice from this company shows, are on the payment terms page linked in step 4 of the table.

Questions and answers

How do I order hookah coals from the factory?
In seven steps: quote, sample, specification, proforma invoice and first payment, production and weathering, loading and documents, balance and release. Start with the quote sheet.
When do I make the first payment?
After the specification is fixed, and against a proforma invoice. The order of the steps is there to stop a payment before the specification is agreed.

Send the quote sheet, then the sample request

The export desk answers both by email.

Open the quote sheet