SP 978 Loading Conditions for Charcoal — 14 Days, 40 °C, 30 cm

This page belongs to the shipping desk of the factory, which makes hookah coals, also called shisha charcoal. It turns one provision of the sea transport rules into a checklist a buyer can hold a supplier to.

Written by
Rudi Kurniawan
Updated

Quick answer

What must be true of my container, and how can I see that it was?

Special provision 978 sets three figures for charcoal: at least 14 days of weathering, at most 40 °C at packing, 30 cm of headspace. Each figure has a paper or a photo that shows it: the weathering certificate for the rest period, the dates on the dangerous goods declaration, and loading photos for the headspace. Ask your supplier for all three before the container sails.

Special provision 978 at a glance

As declared, November 2026

Weathering after production
At least 14 days
Material temperature on the day of packing
No more than 40 °C
Headspace in the container
At least 30 cm
Weathering certificate signed by
Dwi Saputro, Logistics and Shipping Coordinator

The three figures are those of special provision 978, checked on 17 November 2026. The source is under the checklist. How sources are checked

1. The checklist: condition, figure, evidence

Three conditions, three figures, and for each one a piece of evidence you can ask for.

Special provision 978 sets three figures for UN 1361 charcoal: at least 14 days of weathering after production before packing, a material temperature of no more than 40 °C on the day of packing, and at least 30 cm of headspace in the container. Carriers ask for a dangerous goods declaration, a weathering certificate and a stuffing (vanning) certificate. (The provision allows an inert-gas packing route and approval by the competent authority as alternatives to 14 days of weathering. Rules on stacking height and gaps between packages were seen in one secondary source only and are not stated on the site.)

Source: Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 (opens in new tab), International Maritime Organization, accessed

The three conditions of special provision 978 for UN 1361 charcoal, with the figure for each, the evidence a buyer can ask for and who signs it.
ConditionFigureEvidence to ask forWho signs
Weathering after production At least 14 days before packingThe weathering certificate, with the production and packing datesAt this factory: Dwi Saputro, Logistics and Shipping Coordinator
Temperature of the material No more than 40 °C on the day of packingA statement of the temperature on the day of packingThe shipper
Headspace in the container At least 30 cmLoading photos that show the gap; the stuffing certificateNamed on the stuffing certificate

Definition

special provision 978

Special provision 978 is the entry in the IMDG Code that sets the conditions for packing and loading UN 1361 charcoal: weathering, packing temperature and container headspace.

Definition

weathering

Weathering is the rest period between the production of charcoal and its packing, counted in days.

Definition

headspace

Headspace is the empty height left between the top of the cargo and the roof of a container.

Where the provision sits in the classification of charcoal is on the page about UN 1361, Class 4.2.

2. Alternatives the provision allows

The provision does not rest on weathering alone. It names two other routes, and it has further rules that this page does not restate.

  • Inert-gas packing: a packing route the provision allows in place of 14 days of weathering.
  • Approval by the competent authority: the authority of the shipper's country can approve another arrangement.
  • Other stowage rules: the provision has more text than these three figures. Ask your carrier's dangerous goods desk what applies to your booking.

Caution

This page gives no figures for stacking height or for gaps between packages. This site found them in one secondary source only, so they are not stated.

3. What to ask your supplier for

A condition that leaves no trace cannot be checked after the container is sealed. Ask for three things with every shipment, and ask before loading, so they are prepared.

  1. The weathering certificate, with the production date and the packing date.
  2. The dangerous goods declaration, and check that its dates agree with the certificate.
  3. Loading photos taken from the container doors, showing the gap between the cartons and the roof.

The full list of papers, with the issuer of each, is on the page of export documents for a container. Why the coals rest before packing is explained from the production side on the page about how hookah coals are made.

Important

Two dates on two papers should tell the same story. If the packing date on the declaration is less than 14 days after the production date on the certificate, ask before the container sails.

4. Effect on the container load

Headspace costs room. A container that has to stay 30 cm clear under the roof holds fewer cartons than one filled to the top, and the effect is larger in a 20 ft container, which fills by volume.

The planning figures that already allow for it are on the page about container loads by shape and carton.

Note

A quote that states a load above the planning figures deserves a question: how is the headspace kept?

Questions and answers

How long must charcoal be weathered before shipping?
At least 14 days after production and before packing, under special provision 978 of the IMDG Code. The provision allows an inert-gas packing route and approval by the competent authority as alternatives.
How much headspace must a charcoal container have?
At least 30 cm between the cargo and the container roof, under special provision 978. Ask for loading photos that show it.
What temperature limit applies when charcoal is packed?
The material must be no hotter than 40 °C on the day of packing, under special provision 978.

Sources

  1. Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 (opens in new tab), International Maritime Organization — accessed

Give the shipping desk your destination port

The quote sheet takes your port and delivery term, so the reply covers documents and loading.

Open the quote sheet