Quick answer
How long until the container reaches my port, counted from my order?
The wait for a container of hookah coals is the factory's lead time to loading plus the sailing time on a dated carrier schedule. Containers leave from Semarang; Surabaya and Jakarta are also available. This page states no sailing time per port, because none has a dated source yet. Ask your forwarder for the schedule of the booked sailing and add it to the lead time.
Ports and lead time at a glance
As declared, November 2026
- Main loading port
- Semarang
- Other loading ports
- Surabaya, Jakarta
- Lead time, first order
- 30 to 40 days from the first payment to loading
- Lead time, repeat order
- 25 to 35 days from the first payment to loading
- Trade terms offered
- EXW, FOB, CFR, CIF
- Sailing time to your port
- From the carrier's dated schedule; none is stated on this page
1. Loading ports
The factory loads at ports on Java. Its main loading port is Semarang. Surabaya and Jakarta are also available.
- The port for your order is stated in your quote.
- The port is part of the trade term: an FOB price, for example, names the port it refers to.
- Ask for another port in the quote request if your forwarder has a sailing from it.
The factory offers these terms: EXW, FOB, CFR and CIF. What each term leaves to which side is on the page about FOB, CIF or EXW for hookah coals.
2. From order to sailing
The sea leg is only one part of the wait. Before the vessel sails, an order passes through four stages, and one of them has a minimum no supplier can shorten.
| Stage | What happens | Who sets its length |
|---|---|---|
| Production | The coals are pressed and dried | The factory, in its lead time |
| Rest period | The dried coals are weathered before they are packed | The sea transport rules, which set a minimum |
| Packing and loading | The coals are packed, counted and loaded into the container | The factory, in its lead time |
| Port and sailing | The container is delivered to the port for the booked vessel | The carrier's schedule and its cut-off for dangerous goods |
Special provision 978 sets three figures for UN 1361 charcoal: at least 14 days of weathering after production before packing, a material temperature of no more than 40 °C on the day of packing, and at least 30 cm of headspace in the container. Carriers ask for a dangerous goods declaration, a weathering certificate and a stuffing (vanning) certificate. (The provision allows an inert-gas packing route and approval by the competent authority as alternatives to 14 days of weathering. Rules on stacking height and gaps between packages were seen in one secondary source only and are not stated on the site.)
Source: Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 (opens in new tab), International Maritime Organization, accessed
For the stages up to loading the factory states 30 to 40 days for a first order and 25 to 35 days for a repeat order, counted from the first payment to loading. What that lead time is made of, and what shortens it, is on the page about capacity and lead time.
Tip
Give the date you need the container loaded, not the date you need it to arrive. The sailing time is the carrier's, and it is not part of the factory's lead time.
3. Where a sailing schedule comes from
A sailing time is a figure on a carrier's schedule, and it belongs to one sailing on one date. This page states none, because none has been read at a carrier with its date.
Definition
transit time
Transit time is the number of days a vessel schedule gives between departure from the port of loading and arrival at the port of discharge.
Definition
transshipment
Transshipment is the transfer of a container from one vessel to another at a port on the way to its port of discharge.
The schedule that counts is the one for the vessel your container is booked on. Who books it follows from the trade term, and the line has to be one that takes charcoal; what shipping lines have published is on the page about carriers and booking. Ask your forwarder these questions before the order is confirmed:
- Which line, and which sailing, from which port?
- Is the container moved to a second vessel on the way? At which port, and how long does it wait there?
- What is the cut-off date at the port for dangerous goods on that sailing?
- What is the date of the schedule you are reading from?
Caution
A schedule is not a promise of arrival. Lines change sailings, and a container can wait at a transshipment port. Read the date on any sailing time you are given.
4. Plan your stock around the wait
Plan stock around the whole wait, not around the sea leg. The wait has four parts, and each figure comes from a different party.
| Part of the wait | Where the figure comes from |
|---|---|
| Lead time to loading | Your quote; the factory's stated range is in the panel above |
| Sailing time | The carrier's schedule for the booked sailing, with its date |
| Clearance and haulage | Your customs broker and your haulier |
| Margin for a changed schedule | Your own decision |
Add the four figures. Place the next order while the stock on hand still covers that sum; a repeat order has a shorter lead time than a first one, which is the reason to plan repeats ahead. The steps of an order, with the payment stages, are on the page about how an order runs.
What changes by destination is the paperwork and the format, not this arithmetic. The formats quoted first for each country are on the country quote cards. Questions on a port or a sailing go to Dwi Saputro, Logistics and Shipping Coordinator.
Note
Tell the factory how often you order. A repeat order that is known ahead can be planned into production ahead of time.
Questions and answers
Which port do containers of hookah coals leave from?
How long does shipping from Indonesia take?
Is the sailing time part of the factory's lead time?
Sources
- Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 (opens in new tab), International Maritime Organization — accessed