What should a weathering certificate say, and who stands behind it?
A weathering certificate states that the charcoal was kept for at least 14 days between production and packing, as special provision 978 requires. At this factory it is signed by Dwi Saputro, Logistics and Shipping Coordinator. The weathering certificate is the shipper's own statement, not a lab result, and its dates must agree with the dates on the dangerous goods declaration.
The weathering certificate at a glance
As declared, November 2026
- States
- At least 14 days between production and packing
- Signed at this factory by
- Dwi Saputro, Logistics and Shipping Coordinator
- Issued by
- The shipper
- Dates must match
- The dangerous goods declaration
The 14-day figure is that of special provision 978, checked on 17 November 2026. The source is under the first section. How sources are checked
1. The fields, one by one
The certificate exists because of one provision of the sea transport rules.
Special provision 978 sets three figures for UN 1361 charcoal: at least 14 days of weathering after production before packing, a material temperature of no more than 40 °C on the day of packing, and at least 30 cm of headspace in the container. Carriers ask for a dangerous goods declaration, a weathering certificate and a stuffing (vanning) certificate. (The provision allows an inert-gas packing route and approval by the competent authority as alternatives to 14 days of weathering. Rules on stacking height and gaps between packages were seen in one secondary source only and are not stated on the site.)
Source: Resolution MSC.556(108): Amendments to the IMDG Code, special provision 978 (opens in new tab), International Maritime Organization, accessed
Definition
weathering certificate
A weathering certificate is the shipper's written statement of the dates on which charcoal was produced and packed, showing the rest period between them.
| Field | Why it is there | Must match |
|---|---|---|
| Shipper | Says whose statement this is | The invoice and the dangerous goods declaration |
| Product and UN number | Ties the statement to this cargo | The dangerous goods declaration |
| Production date or dates | The start of the rest period | The batch named on the packing list, if one is named |
| Packing date | The end of the rest period | The dangerous goods declaration |
| Statement of the rest period | Says the rest period was at least the minimum | The two dates above |
| Container number | Ties the statement to one container | The bill of lading and the stuffing certificate |
| Name, job title, signature and date | Says who stands behind the statement | The person named by the shipper |
What the provision asks of the container itself is on the page about the loading conditions for charcoal.
2. What the certificate does not prove
The certificate is a statement by the shipper. It is not a lab result, and nobody outside the factory has measured anything for it.
Its strength is that it can be compared. The two dates must be at least the minimum apart, and the packing date must agree with the dangerous goods declaration. A buyer can also ask for photos of the weathering area with its date tags.
Caution
The certificate says nothing about ash, moisture or burn time. Those are on the lab report, which is a different paper from a different issuer.
The classification behind all of this is on the page about UN 1361, Class 4.2.
3. Blank layout
This is a blank layout drawn for this page. It is not a scan of a certificate and carries no stamp and no signature.
| Field | Entry |
|---|---|
| Shipper | ……………………………… |
| Product and UN number | ……………………………… |
| Production date or dates | ……………………………… |
| Packing date | ……………………………… |
| Statement of the rest period | ……………………………… |
| Container number | ……………………………… |
| Name, job title, signature and date | ……………………………… |
Note
A real certificate is issued for one container. Its wording is the shipper's; the fields are what matter.
4. Ask for a draft with your order
Ask for a draft of the certificate with your order, before the container is loaded. Read the draft against the list of fields, and check the two dates against your production schedule.
At this factory the certificate is signed by Dwi Saputro, Logistics and Shipping Coordinator. The signer is listed, with every other desk, on the page of the people at the factory.
Tip
Name the certificate in your purchase order as a paper to be delivered. A paper the order names is a paper the shipment owes you.
If a date on the final certificate differs from the draft, ask why before you pay the balance. A changed date has a reason, and the reason should be on record with the order.
Questions and answers
What is a weathering certificate for charcoal?
Who signs the weathering certificate at this factory?
Is a weathering certificate a lab result?